Customer: TC Energy
Project: Louisiana Xpress Pipeline Expansion
Location: Louisiana

  • Material Management & Warehousing for (3) new compression stations + enhancement of their current pipeline infrastructure
  • Large diameter (up to 48”) pipe management
  • Streamlined safer material handling procedures
  • Consistent track keeping
  • On-Site Material Coordinators
  • End-to-end Documentation Control

Statistics

  • 18-months duration
  • 15 acres with 55,000 sqft of indoor storage facility
  • 0.0 TRIR
  • 900+ truckloads
  • 100% Project Accuracy & Material Accountability